Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q23/0307
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING DUCTED UNIT 1.003,480.003,480.00 Edit Delete
 LOCATION:LIVING AREA
MODEL: RZF140DY / FBFC140
POWER SUPPLY ; CU -1PH 32AMP / FCU ; 1PH /13AMP
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE
2TO SUPPLY AND INSTALL ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPER 1.001,450.001,450.00 Edit Delete
 PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
3TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN 1.00950.00950.00 Edit Delete
 AIR DUCTED WORK CONNECT WITH TOILET AREA.
4TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT 1.002,700.002,700.00 Edit Delete
 LOCATION: MASTERBEDROOM
MODEL:RZF100DV1G /FCF100DVG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE
5TO SUPPLY AND INSTALL ONE LOT OF NEW INSULATED REFRIGERATED COPPER 1.001,250.001,250.00 Edit Delete
 PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
6TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN 1.00200.00200.00 Edit Delete
 AIR DUCTED WORK
7TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT . 1.002,250.002,250.00 Edit Delete
 LOCATION: ROOM 3
MODEL:RZF60DV1G / FCF60 D1VG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE
8   
  
9TO SUPPLY LABOUR MATERIAL TO CHANGE CEILING DUCTED PC BOX 1.00400.00400.00 Edit Delete
10TO SUPPLY LABOUR AND MATERIAL TO GENERAL SERVICE 6 NOS DUCTED UNIT 6.0050.00300.00 Edit Delete
11REMARK     Edit Delete
 1) 70% DEPOSIT TO CONFIRM JOB AND ORDER MATERIAL.
2) BALANCE UPON JOB COMPLETION.
3) EXCLUSION: JOB NOT STATED ABOVE.
Total14.00 12,980.00