|
No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
| 1 | TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING DUCTED UNIT | 1.00 | 3,480.00 | 3,480.00 | Edit | Delete |
| | LOCATION:LIVING AREA
MODEL: RZF140DY / FBFC140
POWER SUPPLY ; CU -1PH 32AMP / FCU ; 1PH /13AMP
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE |
| 2 | TO SUPPLY AND INSTALL ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPER | 1.00 | 1,450.00 | 1,450.00 | Edit | Delete |
| | PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION . |
| 3 | TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN | 1.00 | 950.00 | 950.00 | Edit | Delete |
| | AIR DUCTED WORK CONNECT WITH TOILET AREA. |
| 4 | TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT | 1.00 | 2,700.00 | 2,700.00 | Edit | Delete |
| | LOCATION: MASTERBEDROOM
MODEL:RZF100DV1G /FCF100DVG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE |
|
5 |
|
|
|
|
|
|
|
|
|
| 6 | TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN | 1.00 | 200.00 | 200.00 | Edit | Delete |
| | AIR DUCTED WORK |
| 7 | TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT . | 1.00 | 2,250.00 | 2,250.00 | Edit | Delete |
| | LOCATION: ROOM 3
MODEL:RZF60DV1G / FCF60 D1VG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE |
| 8 | TO SUPPLY AND INSTALL ONE LOT OF NEW INSULATED REFRIGERATED COPPER | 1.00 | 1,150.00 | 1,150.00 | Edit | Delete |
| | PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION . |
| 9 | TO SUPPLY LABOUR MATERIAL TO CHANGE CEILING DUCTED PC BOX | 1.00 | 400.00 | 400.00 | Edit | Delete |
| 10 | TO SUPPLY LABOUR AND MATERIAL TO GENERAL SERVICE 6 NOS DUCTED UNIT | 6.00 | 50.00 | 300.00 | Edit | Delete |
| 11 | REMARK | | | | Edit | Delete |
| | 1) 70% DEPOSIT TO CONFIRM JOB AND ORDER MATERIAL.
2) BALANCE UPON JOB COMPLETION.
3) EXCLUSION: JOB NOT STATED ABOVE. |
| Total | 14.00 | | 12,880.00 |