No Product Quantity Unit Price Amount Function
1   
  
2TO SUPPLY AND INSTALL ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPER 1.001,450.001,450.00 Edit Delete
 PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
3TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN 1.00950.00950.00 Edit Delete
 AIR DUCTED WORK CONNECT WITH TOILET AREA.
4TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT 1.002,700.002,700.00 Edit Delete
 LOCATION: MASTERBEDROOM
MODEL:RZF100DV1G /FCF100DVG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE
5TO SUPPLY AND INSTALL ONE LOT OF NEW INSULATED REFRIGERATED COPPER 1.001,250.001,250.00 Edit Delete
 PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
6TO SUPPLY AND INSTALL ONE LOT OF NEW AIRCON INSULATED GI SUPPLY / RETURN 1.00200.00200.00 Edit Delete
 AIR DUCTED WORK
7TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN INVERTER ENERGY SAVING CEILING CASSETTE UNIT . 1.002,250.002,250.00 Edit Delete
 LOCATION: ROOM 3
MODEL:RZF60DV1G / FCF60 D1VG
RE: INCLUDED DISMANTLE AND DISPOSE EXISTING USED FAULTY SYSTEM FROM JOBSITE
8TO SUPPLY AND INSTALL ONE LOT OF NEW INSULATED REFRIGERATED COPPER 1.001,150.001,150.00 Edit Delete
 PIPE , PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
9TO SUPPLY LABOUR MATERIAL TO CHANGE CEILING DUCTED PC BOX 1.00400.00400.00 Edit Delete
10TO SUPPLY LABOUR AND MATERIAL TO GENERAL SERVICE 6 NOS DUCTED UNIT 6.0050.00300.00 Edit Delete
11REMARK     Edit Delete
 1) 70% DEPOSIT TO CONFIRM JOB AND ORDER MATERIAL.
2) BALANCE UPON JOB COMPLETION.
3) EXCLUSION: JOB NOT STATED ABOVE.
Total14.00 10,650.00