									1								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 2 | TO SUPPLY LABOUR AND MATERIAL | 1.00 | 9,200.00 | 9,200.00 |   Edit |   Delete |  |   | TO INSTALL ONE SET OF NEW DAIKIN 10HP CHILLIER WATER DUCTED FAN COIL UNIT WITH ONE LOT OF CHILLED WATER PIPING, INSULATED CONDENSATE WATER PIPE & SYSTEM CONTROL WIRING ELECTRIC NECESSARY ACCESSORIES , CONTROL VALUE & PIPING FITTING .  |  | 3 | TO SUPPLY LABOUR AND MATERIAL | 1.00 | 2,100.00 | 2,100.00 |   Edit |   Delete |  |   |  TO INSTALL ONE LOT OF PU JACKETING FOR CHILLER WATER PIPING .  |  | 4 | TO SUPPLY LABOUR MATERIAL  | 1.00 | 1,600.00 | 1,600.00 |   Edit |   Delete |  |   | TO INSTALL ONE LOT OF INSULATED SUPPLY AND RETURN AIR DUCT WORK C/W NECCESSARY SUPPORT BRACKET , FLEXIBLE DUCT & SUPPLY /RETURN AIR DIFFUSER . |  | 5 | TO SUPPLY LABOUR AND MATERIAL | 1.00 | 380.00 | 380.00 |   Edit |   Delete |  |   | TO INSTALL ONE NO OF NEW CONDENSATION WATER PUMP .  |  | 6 | TO SUPPLY LABOUR TRANSPORT AND TOOL TO DISMANTLE DOWN EXISTING DAIKIN CHILLER WATER DUCTED UNIT  | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 7 | REMARKS: |   |   |   |   Edit |   Delete |  |   | 1) DEPOSIT REQUEST 50% TO CONFIRM JOB AND MATERIALS ORDER.
 2) BALANCE UPON JOBS COMPLETED.
 3) EXCLUSION: JOBS NOT STATED IN THIS QUOTATION. |  | Total | 5.00 |   | 14,480.00 |  			 
		 |