				| 1 | LEVEVL 1 FOR CU2 AND CU 3  | 1.00 | 42,885.00 | 42,885.00 |   Edit |   Delete |  |   | TO SUPPLY ONLY MITSUBISHI ELECTRIC INVERTER VRF
 CU-MODEL:PUCY-EP900YSKD (250+300+350) 
 FCU-MODEL:PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X10
 FCU-,ODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x1
 FCU -MODEL: PLFY-P50VEM-PA(W) CEILING CASSETTE 18K X3
  |  							
								| 
									2								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 3 | LEVEL 2 FOR CU4 & CU5 | 1.00 | 37,880.00 | 37,880.00 |   Edit |   Delete |  |   | TO SUPPLY ONLY MITSUBISHI ELECTRIC INVERTER VRF
 CU-MODEL:PUCY-EP800YSKD (200+250+350) 
 FCU-MODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x4
 FCU-MODEL:PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X5
 FCU -MODEL: PLFY-P50VEM-PA(W) CEILING CASSETTE 18K X2 |  | 4 | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL FOR MITSUBISHI VRF | 31.00 | 1,950.00 | 60,450.00 |   Edit |   Delete |  |   | 	**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
 TESTING $ COMMISSIONING APPLIED.
 
 CRANE BOOKING (IF ANY) $1700/1DAY
 **NOT INCLUED BRACKET
 **NOT INCLUED CEILING PLASTER |  | 5 | TO SUPPLY LABOUR AND MATERIAL TO DISMANTLE FOR VRF 3 SET | 1.00 | 1,400.00 | 1,400.00 |   Edit |   Delete |  | 6 | REMARKS |   |   |   |   Edit |   Delete |  |   | 	1) 70% DEPOSIT TO CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN MATERIALS ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | Total | 34.00 |   | 142,615.00 |  			 
		 |