No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON ONLY | 1.00 | 21,400.00 | 21,400.00 | Edit | Delete | | MITSUBISHI ELECTRIC INVERTER VRF
CU-MODEL:PUCY-P550YSKD (250+300) X1
FCU-,ODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x3
FCU-MODEL:PLFY-P125VEM-PA(W) CEILING CASSETTE 42K x2 | 2 | TO SUPPLY AIRCON ONLY | 1.00 | 19,100.00 | 19,100.00 | Edit | Delete | | MITSUBISHI ELECTRIC INVERTER VRF
CU-MODEL: PUCY-P400YKD X1
FCU-MODEL:PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X5
FCU-MODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x1
| 3 | TO SUPPLY AIRCON NOLY | 1.00 | 22,280.00 | 22,280.00 | Edit | Delete | | MITSUBISHI ELECTRIC INVERTER VRF
CU-MODEL:PUCY-P450YKD X1
FCU-MODEL: PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X5
FCU -MODEL: PLFY-P50VEM-PA(W) CEILING CASSETTE 18K X3
| 4 | TO SUPPLY AIRCON ONLY | 1.00 | 35,150.00 | 35,150.00 | Edit | Delete | | MITSUBISHI ELECTRIC INVERTER VRF
CU-MODEL:PUCY-EP700YSKD (350+350) X1
FCU-MODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x2
FCU-MODEL:PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X5
FCU -MODEL: PLFY-P50VEM-PA(W) CEILING CASSETTE 18K X2
FCU -MODEL: PLFY-P32VEM-PA(W) CEILING CASSETTE 12K X2 |
5 |
|
|
|
|
|
|
|
6 | TO SUPPLY AIRCON ONLY | 1.00 | 24,980.00 | 24,980.00 | Edit | Delete | | MITSUBISHI ELECTRIC INVERTER VRF
CU-MODEL:PUCY-P500YKD X1
FCU-MODEL:PLFY-P100VEM-PA (W) CEILING CASSETTE 36K x1
FCU-MODEL:PLFY-P63VEM-PA(W) CEILING CASSETTE 24K X1
FCU -MODEL: PLFY-P50VEM-PA(W) CEILING CASSETTE 18K X6
FCU -MODEL: PLFY-P32VEM-PA(W) CEILING CASSETTE 12K X1 | 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL FOR MITSUBISHI VRF | 47.00 | 1,950.00 | 91,650.00 | Edit | Delete | | **INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED.
CRANE BOOKING (IF ANY) $1700/1DAY
**NOT INCLUED BRACKET
**NOT INCLUED CEILING PLASTER | 8 | TO SUPPLY LABOUR AND MATERIAL TO DISMANTLE FOR VRF 6 SET | 6.00 | 1,400.00 | 8,400.00 | Edit | Delete | | 47 NOS INDOOR AND 6NOS OUTDOOR | 9 | REMARKS | | | | Edit | Delete | | 1) 70% DEPOSIT TO CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN MATERIALS ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 58.00 | | 222,960.00 |
|