Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q22/1221
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON ONLY 4.003,350.0013,400.00 Edit Delete
 DAIKIN CHILLED WATER DUCTED FCU
MODEL:UAHMM25AV1
2   
  
3TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY4.00380.001,520.00 Edit Delete
4 TO SUPPLY AND INSTALL CUSTOMIZED FILTER4.00380.001,520.00 Edit Delete
5DUC WORK4.006,800.0027,200.00 Edit Delete
 TO SUPPLY AND INSTALL FABRICATE MAIN DUCT WORK INSULATION MATERIAL USED; PU FOAM C/W RETURN GRILL INCLUDE ANTI VIBRATION INSULATED.
6TO SUPPLY AND INSTALL JACKETING INSULATION4.00950.003,800.00 Edit Delete
7 TO SUPPLY LABOUR TO INSTALL JACKETING PIPE1.005,200.005,200.00 Edit Delete
8 *WATER ANALYSIS REPORT AND TEST WATER VOLUME. *ANDŁ¨WASH PIPE1.002,800.002,800.00 Edit Delete
9 TO SUPPLY AND INSTALL FABRICATE FRESH AIR DUCT 1.008,500.008,500.00 Edit Delete
 600X400/400X250/400X250 FABRICATE MAIN DUCT MATERIAL USED; PU FOAM , FLEXIBLE AND NECESSARY ACCESSRIES
10TO SUPPLY AND INSTALL EXHAUST AIR1.0012,000.0012,000.00 Edit Delete
  500X400 FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,INCLUDE BOX FAN ,LEXIBLE AND NECESSARY ACCESSRIES
11 TO SUPPLY AND INSTALL FABRICATE FRESH AIR FOR KITCHEN 1.002,800.002,800.00 Edit Delete
 FABRICATE MAIN DUCT , MATERIAL USED; PU FOAM,,FLEXIBLE AND NECESSARY ACCESSRIES
12TO SUPPLY AND INSTALL EXHAUST AIR FOR KITCHEN1.002,800.002,800.00 Edit Delete
 FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,,FLEXIBLE AND NECESSARY ACCESSORIES
13TO SUPPLY AND INSTALL COINTROL PANEL AND CABLE FOR DUCTED4.001,900.007,600.00 Edit Delete
14DRAWING AND PE ENDORSEMENT (IF NEEDED)1.002,800.002,800.00 Edit Delete
15REMARKS    Edit Delete
 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total31.00 91,940.00