No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
| 1 | TO SUPPLY AIRCON ONLY | 2.00 | 2,800.00 | 5,600.00 | Edit | Delete |
| | 90000BTU CHELLED WATER CEILING DUCTED FCU |
| 2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL: | 2.00 | 3,800.00 | 7,600.00 | Edit | Delete |
| | 90000BTU CHILL WATER DUCTED FCU INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE |
| 3 | TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY | 2.00 | 380.00 | 760.00 | Edit | Delete |
| 4 | TO SUPPLY AND INSTALL CUSTOMIZED FILTER | 2.00 | 250.00 | 500.00 | Edit | Delete |
| 5 | DUC WORK FOR 90000BTU DUCTED | 2.00 | 5,200.00 | 10,400.00 | Edit | Delete |
| | TOSUPPLY AND INSTALL FABRICATE MAIN DUCT WORK INSULATION MATERIAL USED; PU FOAM C/W RETURN GRILL
INCLUDE ANTI VIBRATION INSULATED.
|
| 6 | TO SUPPLY AIRCON ONLY | 1.00 | 2,100.00 | 2,100.00 | Edit | Delete |
| | 18000BTU CHILLED WATER DUCTED FCU |
| 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL: | 1.00 | 3,100.00 | 3,100.00 | Edit | Delete |
| | 18000BTU CHILL WATER DUCTED FCU INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE |
| 8 | DUC WORK FOR 18000BTU | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete |
| | TOSUPPLY AND INSTALL FABRICATE MAIN DUCT WORK INSULATION MATERIAL USED; PU FOAM.C/W RETURN GRILL ,INCLUDE ANTI VIBRATION INSULATED. |
| 9 | TO SUPPLY AND INSTALL CUSTOMIZED FILTER | 1.00 | 250.00 | 250.00 | Edit | Delete |
| 10 | TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY | 1.00 | 380.00 | 380.00 | Edit | Delete |
| 11 | TO SUPPLY AND INSTALL JACKETING MAN PIPE | 1.00 | 4,200.00 | 4,200.00 | Edit | Delete |
|
12 |
|
|
|
|
|
|
|
|
|
| 13 | TO SUPPLY AIRCON ONLY | 1.00 | 2,100.00 | 2,100.00 | Edit | Delete |
| | 24000BTU CHILLED WATER CASSETTE FCU |
| 14 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL: | 1.00 | 2,950.00 | 2,950.00 | Edit | Delete |
| | 24000BTU CHILLED WATER CASSETTE FCU INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE |
| 15 | TO SUPPLY AND INSTALL FABRICATE FRESH AIR DUCT C/W INLINE FAN 100 X1 NOS | 1.00 | 600.00 | 600.00 | Edit | Delete |
| 16 | TO SUPPLY AND INSTALL FABRICATE FRESH AIR DUCT C/W INLINE FAN 160 X1 NOS | 1.00 | 750.00 | 750.00 | Edit | Delete |
| 17 | TO SUPPLY AND INSTALL COINTROL PANELAND CABLE FOR DUCTED | 3.00 | 700.00 | 2,100.00 | Edit | Delete |
| 18 | TO SUPPLY AND INSTALL TIMER FOR 18K DUCTED FCU | 1.00 | 450.00 | 450.00 | Edit | Delete |
| | SERVER ROOM |
| 19 | 04-02 | 1.00 | 1,950.00 | 1,950.00 | Edit | Delete |
| | TO SUPPLY AIRCON 12000BTU CHILLED WATER CASSETTE FCU |
| 20 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL: | 1.00 | 2,900.00 | 2,900.00 | Edit | Delete |
| | 12000BTU CHILLED WATER CASSETTE FCU INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE |
| 21 | TO SUPPLY AND INSTALL FABRICATE FRESH AIR DUCT C/W INLINE FAN 100 X1 NOS | 1.00 | 600.00 | 600.00 | Edit | Delete |
| 22 | DRAWING AND PE ENDORSEMENT (IF NEEDED) | 1.00 | 2,500.00 | 2,500.00 | Edit | Delete |
| 23 | WATER FLUSHING AND WATER ANALYSIS REPORT (IF NEEDED) | 1.00 | 3,000.00 | 3,000.00 | Edit | Delete |
| 24 | REMARKS | | | | Edit | Delete |
| | 1) 50% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
2) 2ND PROGRESSIVE PAYMENT OF 30% COLLECTION.
3) BALANCE UPON JOB COMPLETION.
4) EXCLUSION: JOBS NOT STATED IN THIS QUOTATION. |
| Total | 29.00 | | 56,590.00 |