| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 3.00 | 1,760.00 | 5,280.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER VRV IV R410GAS
 
 RXMQ6AAVEG 1PH *1
 24K FCU -MODEL FXFQ63AVM (W)*2 FOR STORAGE MV *1/MASTER BEDROOM *1
 12K FCU-MODEL:FXFQ32AVM(W) *1 FOR MAIDS ROOM | 
| 2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 5.00 | 1,760.00 | 8,800.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER VRV IV R410GAS
 
 RXMQ6AAVEG 1PH *1
 12K FCU-MODEL:FXFQ32AVM(W) *5
 FOR WET KITCHEN +DRY KITCHEN +AV/TV ROOM+DAUGHTERS BEDROOM.+WARDROBE . | 
| 3 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 4.00 | 1,760.00 | 7,040.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER VRV IV R410GAS
 
 RXMQ6AAVEG 1PH *1
 12K FCU-MODEL:FXFQ32AVM(W) *3 FOR KIDDO ROOM1+KIDDO BEDROOM2+V.WARDOBE.
 24K FCU -MODEL FXFQ63AVM (W)*1 FOR VIVAN BEDROOM | 
| 4 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 2.00 | 2,300.00 | 4,600.00 |   Edit |   Delete | 
|   | 	DAIKIN 48000BTU CEILING CASSETTE | 
| 5 | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 1.00 | 1,950.00 | 1,950.00 |   Edit |   Delete | 
|   | DAIKIN 1TO2 WALL MOUNTED
 9000BTU WALL
 18000BTU WALL
 
 **AIRCON OUTDOOR BRACKET IF ANY)$180/1SET
 CRANE BOOKING (IF ANY)$950/1DAY
 
 **INCLUDE INSULATION MAIN PIPE " THK (GAS);PIPE
 WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
 **INCLUDE CONCEAL
 TESTING $ COMMISSIONING APPLIED. | 
							
								| 
									6								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 7 | DRAWING | 1.00 | 950.00 | 950.00 |   Edit |   Delete | 
| 8 | REMARKS |   |   |   |   Edit |   Delete | 
|   | 	1) 70% DEPOSIT TO CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN MATERIALS ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. | 
| Total | 16.00 |   | 28,620.00 |