No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL DAIKIN | 1.00 | 26,000.00 | 26,000.00 | Edit | Delete | | CU-RXQ18AYMG *1
FCU-FXFQ100AVM (W) C/C *3
FCU-FXFQ125AVM (W) C/C *1
| 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL DAIKIN | 1.00 | 25,000.00 | 25,000.00 | Edit | Delete | | CU-RXQ16AYMG *1
FCU-FXFQ100AVM (W) C/C *2
FCU-FXFQ125AVM (W) C/C *1
FCU-FXFQ63AVM (W) C/C *1
| 3 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL DAIKIN | 1.00 | 31,500.00 | 31,500.00 | Edit | Delete | | CU-RXQ22AMYMG *1
FCU-FXFQ125AVM (W) C/C *4
FCU-FXFQ63AVM (W) C/C *1
| 4 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL DAIKIN | 1.00 | 27,500.00 | 27,500.00 | Edit | Delete | | CU-RXQ26AMYMG *1
FCU-FXFQ125AVM (W) C/C *3
FCU-FXFQ100AVM (W) C/C *2
FCU-FXFQ63AVM (W) C/C *1
INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED. | 5 | TO SUPPLY LABOUR AND MATERIALS TO | 1.00 | 2,500.00 | 2,500.00 | Edit | Delete | | PROVIDE CORING FROM LEVEL 1 TO LEVEL 2 ,AND LEVEL 2 TO ROOFTOP . | 6 | CRANE BOOKING $1200/1DAY (IF ANY) | 1.00 | 1,200.00 | 1,200.00 | Edit | Delete |
7 |
|
|
|
|
|
|
|
Total | 6.00 | | 113,700.00 |
|