						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY LABOUR AND MATERIALS TO  | 2.00 | 1,400.00 | 2,800.00 |   Edit |   Delete | 
|   | RELOCATED 2 NOS DAIKIN 10HP CEILING DUCTED UNIT .
 TESTING $ COMMISSIONING APPLIED. | 
| 2 | 	TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 2.00 | 4,350.00 | 8,700.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER CEILING CASSETTE TYPE (5HP )
 MODEL:RZR125MVMG/FCQ125KAVEA | 
| 3 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 4.00 | 3,950.00 | 15,800.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER CEILING CASSETTE TYPE (4HP)
 MODEL:RZR100MVMG/FCQ100KANEA  | 
| 4 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 4.00 | 3,350.00 | 13,400.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER CEILING CASSETTE TYPE (3HP )
 MODEL:RZR71LVVMG&FCQ71LUV1  | 
							
								| 
									5								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 6 | TO SUPPLY AND INSTALL  DAIKIN ADAPTOR CARD AND CONTROL  PANEL  | 1.00 | 1,550.00 | 1,550.00 |   Edit |   Delete | 
|   | INSULATION CONTROL WIRE CABLE TRAY PVC TRUNKING AND WATER PIPE 
  | 
| 7 | TO SUPPLY AND INSTALL STANIESS STEEL BRACKET  | 12.00 | 150.00 | 1,800.00 |   Edit |   Delete | 
| 8 | TO SUPPLY AND INSTALL NEW DUCTWORK WITH EXTERNAL ACCESSORIES | 1.00 | 16,800.00 | 16,800.00 |   Edit |   Delete | 
|   | 1)DUCTWORK WITH EXTERNAL INSULATION (2 METER INTERNAL INSULATION AND FABRICATE; 
 MATERIAL USED; PE FOAM. 
 2)FOUR WAY DIFFUSES 600MMX600MM.C/W16NOS GRILL
 3)MOTORIZED DAMPER WITH ACTUATOR SPRING RETURN.
 4)VOLUME CONTROL DAMPER.
 5)TRANFRE AIR RETURN DUCT. | 
| 9 | CRANE BOOKING (IF ANY) $750/1DAY |   |   |   |   Edit |   Delete | 
| 10 | 	REMAPKS: |   |   |   |   Edit |   Delete | 
|   | 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 20%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE.
  | 
| Total | 26.00 |   | 60,850.00 |