Branch Last Update admin   
Name Quotation No Q
Running Reference : Q21/1205R1
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY ONLY AT UNIT 02M-074.002,500.0010,000.00 Edit Delete
 10HP CHILL WATER DUCTED UNIT 40LM100
2TO SUPPLY AIRCON, LABOUR AND MATERIALS TO INSTALL:4.003,600.0014,400.00 Edit Delete
 CHILL WATER PIPING (WITHIN 3M) INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
3TO SUPPLY AND INSTALL JACKETING PIPE1.007,000.007,000.00 Edit Delete
4TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY4.00380.001,520.00 Edit Delete
5TO SUPPLY AND INSTALL CUSTOMIZED FILTER4.00250.001,000.00 Edit Delete
6TO FABRICATE MAIN DUCT WORK (EST LENGTH 6M)4.004,500.0018,000.00 Edit Delete
 C/W 4NOS TO 6NOS FOUR WAY GRILL AND INSULATION
7HONEYWELL DUCT CONTROLLER AND CONTROL BOX4.00800.003,200.00 Edit Delete
8TO SUPPLY ONLY AT SERVER ROOM2.001,950.003,900.00 Edit Delete
 18000BTU CHILL WATER DUCTED UNIT
9LABOUR CHARGE TO INSTALL2.002,800.005,600.00 Edit Delete
 INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
10FABRICATE DUCT WORK 2.001,300.002,600.00 Edit Delete
 C/W 1NOS OF GRILL AND RETURN GRILL
11   
  
12TO SUPPLY ONLY AT UNIT 02-03 & 02-04(staff room)2.001,950.003,900.00 Edit Delete
 24000BTU CHILL WATER CASSETTE UNIT
13LABOUR CHARGE TO INSTALL2.002,600.005,200.00 Edit Delete
 INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
14FABRICATE FRESH AIR DUCT C/W INLINE FAN AND MOTOR FOR 02071.00850.00850.00 Edit Delete
15DRAWING AND PE ENDORSEMENT (IF NEEDED)1.001,800.001,800.00 Edit Delete
16WATER FLUSHING AND WATER ANALYSIS REPORT (IF NEEDED)1.003,000.003,000.00 Edit Delete
17RUM SUM DISCOUNT 5%1.00   Edit Delete
18REMARKS:    Edit Delete
 1) 50% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
2) 2ND PROGRESSIVE PAYMENT OF 30% COLLECTION.
3) BALANCE UPON JOB COMPLETION.
4) EXCLUSION: JOBS NOT STATED IN THIS QUOTATION.
Total39.00 77,786.50