Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q21/1205R1
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY ONLY AT UNIT 02M-074.002,500.0010,000.00 Edit Delete
 10HP CHILL WATER DUCTED UNIT 40LM100
2TO SUPPLY AIRCON, LABOUR AND MATERIALS TO INSTALL:4.003,600.0014,400.00 Edit Delete
 CHILL WATER PIPING (WITHIN 3M) INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
3TO SUPPLY AND INSTALL JACKETING PIPE1.007,000.007,000.00 Edit Delete
4TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY4.00380.001,520.00 Edit Delete
5TO SUPPLY AND INSTALL CUSTOMIZED FILTER4.00250.001,000.00 Edit Delete
6   
  
7HONEYWELL DUCT CONTROLLER AND CONTROL BOX4.00800.003,200.00 Edit Delete
8TO SUPPLY ONLY AT SERVER ROOM2.001,950.003,900.00 Edit Delete
 18000BTU CHILL WATER DUCTED UNIT
9LABOUR CHARGE TO INSTALL2.002,800.005,600.00 Edit Delete
 INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
10FABRICATE DUCT WORK 2.001,300.002,600.00 Edit Delete
 C/W 1NOS OF GRILL AND RETURN GRILL
11SUPPLY AND INSTALL 12HR/12HR CONTROL PANEL1.001,700.001,700.00 Edit Delete
12TO SUPPLY ONLY AT UNIT 02-03 & 02-04(staff room)2.001,950.003,900.00 Edit Delete
 24000BTU CHILL WATER CASSETTE UNIT
13LABOUR CHARGE TO INSTALL2.002,600.005,200.00 Edit Delete
 INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE
14FABRICATE FRESH AIR DUCT C/W INLINE FAN AND MOTOR FOR 02071.00850.00850.00 Edit Delete
15DRAWING AND PE ENDORSEMENT (IF NEEDED)1.001,800.001,800.00 Edit Delete
16WATER FLUSHING AND WATER ANALYSIS REPORT (IF NEEDED)1.003,000.003,000.00 Edit Delete
17RUM SUM DISCOUNT 5%1.00   Edit Delete
18REMARKS:    Edit Delete
 1) 50% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
2) 2ND PROGRESSIVE PAYMENT OF 30% COLLECTION.
3) BALANCE UPON JOB COMPLETION.
4) EXCLUSION: JOBS NOT STATED IN THIS QUOTATION.
Total36.00 61,486.50