| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY AND INSTALL: | 2.00 | 2,900.00 | 5,800.00 |   Edit |   Delete |  |   | BRAND: CARRIER 
 CHILL WATER FAN COIL UNIT 
 MODEL: 40LM100 
 LOCATION:5.1 & 5.10 |  | 2 | MODEL:40LM150 | 3.00 | 4,800.00 | 14,400.00 |   Edit |   Delete |  |   | LOCATION: 5.2 ; 5.7; 5.8 |  | 3 | MODEL: 40LM200 | 2.00 | 6,800.00 | 13,600.00 |   Edit |   Delete |  |   | LOCATION: 5.3 ;5.6;  |  | 4 | MODEL: 40LM050 | 1.00 | 1,900.00 | 1,900.00 |   Edit |   Delete |  |   | LOCATION: 5.5 |  | 5 | MODEL: 40LM060 | 1.00 | 2,300.00 | 2,300.00 |   Edit |   Delete |  |   | LOCATION: 5.9 |  							
								| 
									6								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL: | 1.00 | 22,000.00 | 22,000.00 |   Edit |   Delete |  |   | SWANGER; MOTORIZED VALVE; GATE VALVE AND BALANCING VALVE ONLY. |  | 8 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 1.00 | 19,000.00 | 19,000.00 |   Edit |   Delete |  |   | RE-INSULATED NEW PU JACKETING. |  | 9 | TO SUPPLY,DELIVER AND INSTALL NEW CHILLED WATER PIPING : | 1.00 | 102,000.00 | 102,000.00 |   Edit |   Delete |  |   | A) USING BLACK C PIPE FOR AIR CONDITIONING SYSTEM INCLUSIVE NECESSARY HANGER/SUPPORT, INSULATION, FITTINGS AND ACCESSORIES.
 B)PIPE SIZE :25MM; 50MM;65MM; 80MM; 100MM; 125MM; 150MM
 C) 150MM HOT PIPING FROM EXISTING MAIN PIPE C/W GATE VALVE.
  |  | 10 | TO SUPPLY LABOUR AND MATERIALS TIO INSTALL: | 1.00 | 18,500.00 | 18,500.00 |   Edit |   Delete |  |   | CONTROL PANEL C/W 01 NOS PUSH BUTTON; 11 NOS OF DIGITAL CONTROLLER THERMOSTAT. |  | 11 | 2NOS SCISSOR LIFT RENTAL/NOS/MTH | 2.00 | 750.00 | 1,500.00 |   Edit |   Delete |  | 12 | DRAWING (IF NEEDED) | 1.00 | 800.00 | 800.00 |   Edit |   Delete |  | 13 | REMARKS: |   |   |   |   Edit |   Delete |  |   | 1) 50% DEPOSIT TO CONFIRM JOB AND ORDER MATERIALS.
 2) PROGRESSIVE CLAIM SUBJECT TO WORK PROGRESS.
 3) FULL SETTLEMENT FOR EQUIPMENT PRIOR TO DELIVER.
 4) EXCLUSION: DRAWING, SUBMISSION AND WORKS NOT STATED IN THIS QUOTATION. |  | Total | 16.00 |   | 201,800.00 |  			 
		 |