Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q21/0312R1
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON FOR: 1ST STOREY 1.0013,500.0013,500.00 Edit Delete
 NEW DAIKIN VAV A R410GAS
RXQ16AYMX1
CEILING DUCTED FXMQ125*2 (DINING ,LIVING )
CEILING DUCTED FXMQ100*1 (WINE)
2TO SUPPLY AIRCON FOR :(2ND STOREY AND ATTIC1.0015,800.0015,800.00 Edit Delete
 NEW DAIKIN VRV
RXQ18AYM *1 ( FCU*6)
WALL MOUNTED FXAQ63A *2 (BEDROOM1,BEDROOM2
CEILINGCASSETTE FXFQ63A*1 (STAIR )
WALL MOUNTED FXAQ32 *1 (MAID ROOM)
CEILING DUCTED FXMQ50*1(MASTER WARDROBE)
CEILING DUCETED FXMQ125*1(MASTER BEDROOM)

(ATTIC)
NEW WALL FXAQ63A *1 FOR FCU-A-STY

CU.12HP + 12HP
32WALL *1
50WALL *1
63 CASSETTE *1
50 CASSETTE *1
3TO SUPPLY AIRCON FOR (ATTIC)1.001,450.001,450.00 Edit Delete
 NEW CEILING CASSETTE FXFQ125A*1
4TO SUPPLY LABOUR AND MATERIALS TO INSTALL DAIKIN VRV15.001,400.0021,000.00 Edit Delete
 CEILING DUCETD *5 NOS
CEILING CASSETTE *4 NOS
WALL MOUNTED *6 NOS
INCLUDE INSULATION 22G; THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED.
5 DUCT WORK FOR CEILING DUCTED 5.004,800.0024,000.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND 1NOS LINEAR BOX (MATERIAL USED; PE FOAM.)
C/W 1NOS ABS GRILL, INSULATION,FLEXBLE AND NECESSARY ACCESSRIES
6TO SUPPLY LABOUR AND MATERIALS TO INSTALL FOR FAF-1-PPR2.00800.001,600.00 Edit Delete
 1 NOS DUCTING 150X150/1 NOS INLINE FAN 150X150
7FILTER $200.00+ WATER TRAY $2505.00450.002,250.00 Edit Delete
8   
  
9 TO SUPPLY AND INSTALL Y JOINT FOR FCU (FOR ATTIC VRV SYSTEM)5.00140.00700.00 Edit Delete
  *INCLUDE 1" INSULATION CABLE TRAY AND DRAINAGE PIPE, LL NECESSARY PARTS.
10CRANE BOOKING $900/DAY1.00900.00900.00 Edit Delete
Total36.00 81,200.00