No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 46,000.00 | 46,000.00 | Edit | Delete | | BRAND : DAIKIN VRV
CU: RXUQ18AMYM
CEILING DUCTED UNIT (FXMQ100PA X1)FOR LIV
WALL MOUNTED UNIT FXAQ32AVM X1 FOR MASTER WARDROBE 1 ;
WALL MIUNTED UNIT FXAQ63AVM X5 FOR MBR1,HOME GYM, MASTER WARDROBE 2 , MBR 2,
FAMILY 2)
NCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED. | 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 46,000.00 | 46,000.00 | Edit | Delete | | BRAND : DAIKIN VRV
CU: RXUQ18AMYM
CEILING DUCTED UNIT (FXMQ100PA X1 FOR DIN/DRY KITCHEN)
WALL MOUNTED (FXAQ32AVM FOR MASTER WARDROBE)
WALL MOUNTED (FXAQ63AVM X5 FOR MBR 1 , BR & WARDROBE , BR 2 & WARDROBE , STUDY RM , FAMILY 2
NCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED. | 3 | DUCT WORK FOR DIN/DRY KITCHEN | 1.00 | 8,500.00 | 8,500.00 | Edit | Delete | | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.
| 4 | DUCT WORK FOR LIV | 1.00 | 6,500.00 | 6,500.00 | Edit | Delete | | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.
| 5 | SUBMISSION FOR BCA/RELEVANT | 1.00 | 3,500.00 | 3,500.00 | Edit | Delete | | * NOT INCLUDED STAINLESS STEEL BRACKET
*NOT INCLUDED MOBILE CRANE
|
6 |
|
|
|
|
|
|
|
Total | 5.00 | | 110,500.00 |
|