						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
											
								| 
									1								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 1,960.00 | 1,960.00 |   Edit |   Delete |  |   | MITSUBISHI ELECTRIC INVERTER WALL MOUNTED (MUY24 /MSYGN24 )
 24000BTU FOR BEDROOM 4 |  | 3 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:(´óÌü£© | 1.00 | 2,800.00 | 2,800.00 |   Edit |   Delete |  |   | MITSUBISHI ELECTRIC INVERTER CEILING CASSETTE £¨PLY-P80EA/PUY-KA80VA£©4 TICK
 1TO1 30,000BTU FOR LIVING . |  | 4 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:(·¹Ìü£© | 1.00 | 2,550.00 | 2,550.00 |   Edit |   Delete |  |   | MITSUBISHI ELECTRIC INVERTER CEILING CASSETTE £¨PLY-P80EA/PUY-KA80VA£©4 TICK 
 1TO1 18000BTU FOR  DINING . |  | 5 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 2,980.00 | 2,980.00 |   Edit |   Delete |  |   | MITSUBISHI ELECTRIC INVERTER (MXY-3G28VA2 /MSXY-FN18VE X2)
 1TO 2 18000BTU FOR BEDROOM 2, STUDY ROOM .
 TO DISMANTLE EXISTING COPPER AND INSTALL NEW COPPER PIPING C/W INSULATION AND DRAIN PIPE¡£
 MATERIAL:
 1/4"X50 X22SWG COPPER PIPE .
 3/8"X50 X22SWG COPPER PIPE .
 5/8"X1/2" X2M K-FLEX ST CLASS 1.
 16MM PVC PIPE
 PVC TRUNKING .
 3 CORE FLEXIBLE .  |  | 6 | TO DISMANTLE EXISTING COPPER AND INSTALL NEW COPPER PIPING C/W INSULATION AND DRAIN PIPE.  | 1.00 | 1,000.00 | 1,000.00 |   Edit |   Delete |  |   | SAMSUNG 1TO2 WALL 
 12000BTU FOR KITCHEN ,9000BTU FOR YARD,
 MATERIAL:
 1/4"X50 X22SWG COPPER PIPE .
 3/8"X50 X22SWG COPPER PIPE .
 5/8"X1/2" X2M K-FLEX ST CLASS 1.
 16MM PVC PIPE
 PVC TRUNKING .
 3 CORE FLEXIBLE .  |  | 7 | AIRCON OUTDOOR BRACKET NEW | 3.00 | 150.00 | 450.00 |   Edit |   Delete |  | 8 | REMAPKS: |   |   |   |   Edit |   Delete |  |   | 1)70% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
 2) BALANCE UPON JOB COMPLESION.
 3) EXCLUSION: JOB NOT STATED ABOVE |  | Total | 8.00 |   | 11,740.00 |  			 
		 |