Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q20/0201
Address Customer No KIM
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY LABOUR, MATERIALS TO 9.00950.008,550.00 Edit Delete
 ~DISMANTLE EXISTING DUCTED BY OPEN CEILING & DISPOSE.
VRV4S 6HP CU 1 SET OF 1 TO 4 ; AND 1 SET OF 1 TO 5.
~NEW INSTALLATION BY USING MATERIALS:
*22G COPPER PIPING;
*K FLEX CLASS O 1" THK INSULATION(GAS PIPE);3/4" THK INSULATION(TO FCU);1/2" THK INSULATION (LIQUID PIPE).
2TO SUPPLY LABOUR TO9.00650.005,850.00 Edit Delete
 DISMANTLE DUCTING AND RECONNECT BACK BY USING PE-FOAM , PE INSULTION
3   
  
4TO SUPPLY AND INSTALL9.00150.001,350.00 Edit Delete
 CUSTOMIZED WATER TRAY
5CARDBOARD FOR GROUND PROTECTION3.0060.00180.00 Edit Delete
6TO SUPPLY LABOUR TO20.0080.001,600.00 Edit Delete
 TAKE DOWN EXISTING BAR GRILL TO CLEAN AND PAINT
7TO SUPPLY LABOUR TO1.00500.00500.00 Edit Delete
 TAKE DOWN LIVING HALL BAR GRILL (EST. 3M TO 8M LENGTH)TO CLEAN AND PAINT
8DISCOUNT 1.00   Edit Delete
9REMAPKS:    Edit Delete
 1) 50% DEPOSIT TO START WORK.
2) OPEN CEILING EXCLUDE PAINTING AND PLASTER BACK.
3) EXCLUSION: AIRCON AND WORK NOT STATED IN THIS QUOTATION.
4) OUTSTANDING BALANCE UPON COMPLETION OF WORK.
Total52.00 17,030.00