Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q19/1108
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON ONLY    Edit Delete
 DAIKIN CHILLED WATER FAN COIL UNIT
FWPMM-AV1-N-CEILING CONCEALED (LEFT PIPING ) TYPE COMPLETE WITH:
~ COOLING COIL
~ FAN MOTOR
~ WITHOUT THERMOSTAT, CONTROLS, 3 SPEED ROTARY SWITCH, FILTER
DAIKIN AIR HANDING UNIT COMPLETE WITH; (APPLICATION 1)
*DOUBLE SKIN SANDWICH PANEL (25MM THICKNESS)
*0.5MM THICKNESS INTERNAL AND EXTERNAL G.I SHEET
*BELT-DRIVEN CENTRIFUGAL FAN
*SPRING IS0LATOR / RUBBER PAD BELOW FAN
*COOLING COIL (CU/AI )
*MOTOR (IE3)C/W SPACE HEATER - VSD COMPATIBLE
*STANDBY MOTOR (IE3) C/W SPACE HEATER - VSD COMPATIBLE
*DRIVE (FIXED PITCH)
*DRAIN PAN (SS 304)
*PRIMARY FILTER SECTION WITH FRAME ONLY (FILTER MEDIA BY OTHERS)
*ELECTRIC HEATER
(OTHERS NOT MENTIONED ARE NOT INCLUDED IN THIS OFFER)


2 PFCU 02-01 & 02 (DDM1-0413B)2.0010,380.0020,760.00 Edit Delete
3RFCU 02-01 (FWPMM16AV1-N)1.001,360.001,360.00 Edit Delete
4RFCU 02-02 (FWPMM9AV1-N)1.001,035.001,035.00 Edit Delete
5RFCU 02-03 & 04 (FWPMM14AV1-N)2.001,250.002,500.00 Edit Delete
6RFCU 02-05 (FWPMM14AV1-N )1.001,250.001,250.00 Edit Delete
7   
  
8TO SUPPLY LABOUR FOR INSTALLATION OF 6 NUMBERS OF FCU AND 2 NUMBERS OF PFCU1.0066,800.0066,800.00 Edit Delete
 100MM=32M
65MM-48
50MM-16
40MM=18
32MM=48
25MM=6
PFCU 65MM=2NOS.
FCU 32MM=5NOS.
FCU 25MM=1NOS.

*EXCLUSIONS: SCAFFOLDING, LIFTING EQUIPMENT & ALL OTHERS NOT MENTIONED IN THIS QUOTE.






9TO SUPPLY LABOUR & MATERIALS TO INSTALL THICKNESS 0.4 G. I JACKETING P. U INSULATION.1.0019,000.0019,000.00 Edit Delete
 REMAPKS:
1) AFTER FIRST PROGRESSIVE PAYMENT OF 70%, AIRCON ARRIVAL ABOUT 7 WORKING DAYS.
2) MATERIALS ORDER (EX:JACKETING PIPE) TAKES ABOUT 3 TO 5 WORKING DAYS.
3) WITH MATERIAL ARRIVE, JOB NEED 10 TO 15 WORKING DAYS TO COMPLETE.
4) EXCLUSION: JOB NOT STATED IN THIS QUOTATION.
Total9.00 112,705.00