									1								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 4.00 | 1,800.00 | 7,200.00 |   Edit |   Delete |  |   | EXISTING AC EQUIPMENT AT GROUND FLOOR MEETING ROOM AND CONFERENCE ROOM 
 C/W STANDARD COPPER PIPE WITH INSULATION AND DRAIN PIPE  |  | 3 | THIRD STOREY BRAND NEW VRV AT CONTACT CENTRE  | 1.00 | 40,700.00 | 40,700.00 |   Edit |   Delete |  |   | BRAND: DAIKIN
 CU MODEL : RXQ10AYM WITH DUCTED INDOOR FXMQ250MA (SERVER RM)
 CU MODEL: RXQ32AMYM WITH DUCTED INDOOR FXMQ250MA (SERVER RM);
 FXFQ32A CASSETTE *1(DIRECTOR RM);FXFQ25A *1 (MEETING); FXFQ63A *3 (WORKSTATION); FXFQ80A *1 (WORKSTATION); FXFQ80A * 3 (WORKSTATION) |  | 4 | INSTALLATION CHARGE FOR VRV SYSTEM  | 1.00 | 18,200.00 | 18,200.00 |   Edit |   Delete |  | 5 | VRV SYSTEM OUTDOOR BRACKET (IF ANY) | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 6 | CRANE BOOKING PER DAY (IF ANY) | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 7 | REMAPKS: |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
 2) 90% PROGRESSIVE COLLECTION ONCE ALL AIRCON INSTALLATION COMPLETED.
 3) FULL PAYMENT UPON COMPLETION OF WORK.
 4) EXCLUSION: PE ENDORSEMENT AND WORK NOT STATED ABOVE. |  | Total | 8.00 |   | 68,500.00 |  			 
		 |