						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY AND INSTALL ONLY  | 1.00 | 5,200.00 | 5,200.00 |   Edit |   Delete | 
|   | A) HEAT RECOVERY FRESH AIR EXCHANGER AT 1500CMH | 
| 2 | SCISSOR LIFT RENTAL | 1.00 | 850.00 | 850.00 |   Edit |   Delete | 
| 3 | TO SUPPLY LABOUR AND MATERIALS TO  | 1.00 | 6,800.00 | 6,800.00 |   Edit |   Delete | 
|   | FABRICATE  DUCT WORKS FOR SUPPLY DUCT ( EST LENGTH BETWEEN 20-30M )
 MATERIAL USED :PE FOAM
 C/W 10NOS OF 150 ROUND GRILL; 1 NOS OF 4WAY BAR GRILL AT SIZE 300X400; FLEXIBLE:BRACKET AND NECESSARY ACCESARIES | 
| 4 | TO SUPPLY LABOUR AND MATERIALS TO  | 1.00 | 6,800.00 | 6,800.00 |   Edit |   Delete | 
|   | FABRICATE DUCT WORKS FOR  RETURN DUCT (EST LENGTH BETWEEN 20~30M )
 MATERIAL USED :PE FOAM 
 C/W 10NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400; FLEXIBE; BRACKET AND NECESSARY ACCESARIES. | 
							
								| 
									5								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 6 | TO FABRICATE DUCT WORKS FOR SUPPLY DUCT (EST LENGTH 8M ) | 1.00 | 2,700.00 | 2,700.00 |   Edit |   Delete | 
|   | MATERIAL USED: PE FOAM
 C/W 4 NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400;FLEXIBE; BRACKET AND NECESSARY ACCESSORIES. | 
| 7 | TO FABRICATE DUCT WORKS FOR SUPPLY RETURN DUCT (EST LENGTH 8M ) | 1.00 | 2,700.00 | 2,700.00 |   Edit |   Delete | 
|   | 	MATERIAL USED: PE FOAM
 C/W 4 NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400;FLEXIBE; BRACKET AND NECESSARY ACCESSORIES. | 
| 8 | REMARKS: |   |   |   |   Edit |   Delete | 
|   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE PAYMENT UPON AIRCON ARRIVE AND BEFORE INSTALLATION.
 3) FULL PAYMENT UPON COMPLETION OF WORK.
 4) EXCLUSION: WORKS NOT STATED IN THIS QUOTATION. | 
| Total | 6.00 |   | 25,050.00 |