No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 |
|
|
|
|
|
|
|
2 | SCISSOR LIFT RENTAL | 1.00 | 850.00 | 850.00 | Edit | Delete |
3 | TO SUPPLY LABOUR AND MATERIALS TO | 1.00 | 6,800.00 | 6,800.00 | Edit | Delete |
| FABRICATE DUCT WORKS FOR SUPPLY DUCT ( EST LENGTH BETWEEN 20-30M )
MATERIAL USED :PE FOAM
C/W 10NOS OF 150 ROUND GRILL; 1 NOS OF 4WAY BAR GRILL AT SIZE 300X400; FLEXIBLE:BRACKET AND NECESSARY ACCESARIES |
4 | TO SUPPLY LABOUR AND MATERIALS TO | 1.00 | 6,800.00 | 6,800.00 | Edit | Delete |
| FABRICATE DUCT WORKS FOR RETURN DUCT (EST LENGTH BETWEEN 20~30M )
MATERIAL USED :PE FOAM
C/W 10NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400; FLEXIBE; BRACKET AND NECESSARY ACCESARIES. |
5 | TO SUPPLY AND INSTALL ONLY | 1.00 | 3,500.00 | 3,500.00 | Edit | Delete |
| HEAT RECOVERY FRESH AIR EXCHANGERAT 600CMH |
6 | TO FABRICATE DUCT WORKS FOR SUPPLY DUCT (EST LENGTH 8M ) | 1.00 | 2,700.00 | 2,700.00 | Edit | Delete |
| MATERIAL USED: PE FOAM
C/W 4 NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400;FLEXIBE; BRACKET AND NECESSARY ACCESSORIES. |
7 | TO FABRICATE DUCT WORKS FOR SUPPLY RETURN DUCT (EST LENGTH 8M ) | 1.00 | 2,700.00 | 2,700.00 | Edit | Delete |
| MATERIAL USED: PE FOAM
C/W 4 NOS OF 150 ROUND GRILL; 1 NOS OF 4 WAY BAR GRILL AT SIZE 300X400;FLEXIBE; BRACKET AND NECESSARY ACCESSORIES. |
8 | REMARKS: | | | | Edit | Delete |
| 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE PAYMENT UPON AIRCON ARRIVE AND BEFORE INSTALLATION.
3) FULL PAYMENT UPON COMPLETION OF WORK.
4) EXCLUSION: WORKS NOT STATED IN THIS QUOTATION. |
Total | 6.00 | | 23,350.00 |