No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON,LABOUR,MATERIALS TO REPLACE AND USE BACK PIPING | 1.00 | 25,850.00 | 25,850.00 | Edit | Delete | | VRV IV Q INVERTER R410 (SET A)
CU:RQQ16TYM WITH FXAQ50P*2(GAMES ROOM;BDRM 3 );FXAQ63P*2(GUEST RM; BDRM4);FXMQ63PA*1(DRY KITCHEN);FXFQ63A*1 (DINING) | 2 | SET A ADD ON: | 1.00 | 560.00 | 560.00 | Edit | Delete | | FILTER $280.00 + WATER TRAY $280.00 | 3 | SET A DUCT WORK: | 1.00 | 2,800.00 | 2,800.00 | Edit | Delete | | TO FABRICATE AND CONNECT TO THE EXISTING | 4 | VRV IV Q INVERTER R410 (SET B) | 1.00 | 20,780.00 | 20,780.00 | Edit | Delete | | CU:RQQ14TYM WITH FXMQ250M*1 (HALL); FXMQ100PA*1 (HALL) | 5 | SET B ADD ON: | 2.00 | 560.00 | 1,120.00 | Edit | Delete | | FILTER $280.00 + WATER TRAY $280.00 | 6 | SET B DUCT WORK FOR FXMQ250M AT HALL | 1.00 | 3,300.00 | 3,300.00 | Edit | Delete | | TO FABRICATE AND CONNECT TO THE EXISTING
| 7 | SET B DUCT WORK FOR FXMQ100PA AT TERRACE | 1.00 | 1,600.00 | 1,600.00 | Edit | Delete | | TO FABRICATE AND CONNECT TO THE EXISTING | 8 | VRV IV Q INVERTER R410(SET C) | 1.00 | 23,450.00 | 23,450.00 | Edit | Delete | | CU: RQQ14TYM WITH FXFQ63A*2;FXFQ80A*1;FXFQ125PA*1 | 9 | SET C ADD ON: | 1.00 | 560.00 | 560.00 | Edit | Delete | | FILTER $280.00 + WATER TRAY $280.00 | 10 | SET C DUCT WORK: | 1.00 | 1,450.00 | 1,450.00 | Edit | Delete | | TO FABRICATE AND CONNECT TO THE EXISTING | 11 | VRV IV Q INVERTER R410 (SET D) | 1.00 | 17,170.00 | 17,170.00 | Edit | Delete | | CU:RQQ12TYM WITH FXFQ80A*3;FXAQ50P*1 | 12 | MULTI SPLIT SYSTEM | 1.00 | 4,670.00 | 4,670.00 | Edit | Delete | | 4MKS80FSG WITH FFQ35BVV*1(JUNIOR MASTER BDRM);FFQ50BV1B (WALK IN WARDROBE) | 13 | RZR100MVMG/FCQ100KAVEA SINGLE SPLIT CASSETTE AT NEW STUDY RM | 1.00 | 3,750.00 | 3,750.00 | Edit | Delete | 14 | BRACKET FOR OUTDOOR UNIT | 2.00 | 150.00 | 300.00 | Edit | Delete |
15 |
|
|
|
|
|
|
|
16 | REMARKS: | | | | Edit | Delete | | 1) AIRCON C/W WIRELESS REMOTE CONTROLLER
2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
4) FULL PAYMENT UPON JOB COMPLETED.
5) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 16.00 | | 107,360.00 |
|