No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON,LABOUR, MATERIALS TO REPLACE PIPING: | 1.00 | 1,900.00 | 1,900.00 | Edit | Delete | | MATERIAL USE:SWG22 COPPER TUBING;PREMIUM ARMAFLEX CLASS 1 INSULATION WITH 1/2 INCH THICK | 2 | BRAND: MEQ MULTI SPLIT WALL TYPE | 1.00 | 3,200.00 | 3,200.00 | Edit | Delete | | MXY-3G28VA2 WITH MSXY-FN13VE (12000BTU LOCATE AT BEDROOM 2); MSXY-FN10VE (9000BTU LOCATE AT STORE ROOM + BEDROOM 3) |
3 |
|
|
|
|
|
|
|
4 | BRAND: MEQ SINGLE SPLIT WALL TYPE | 1.00 | 1,200.00 | 1,200.00 | Edit | Delete | | MUY-GN13VA/MSY-GN13VA (12000BTU WALL AT MASTER BEDROOM)
*3 TICKS | 5 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE PRESSURE TEST & WATER PIPE | 1.00 | 550.00 | 550.00 | Edit | Delete | 6 | REMARKS: | | | | Edit | Delete | | 1) WORKS EXCLUDE BRACKET;TRUNKING;16MM DRAIN PIPE AND THOSE NOT STATED IN THIS QUOTATION.
2) PAYMENT : 70% DEPOSIT, BALANCE UPON COMPLETION OF WORK. | Total | 4.00 | | 6,850.00 |
|