| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY AIRCON,LABOUR, MATERIALS TO REPLACE PIPING: | 1.00 | 1,900.00 | 1,900.00 |   Edit |   Delete |  |   | MATERIAL USE:SWG22 COPPER TUBING;PREMIUM ARMAFLEX CLASS 1 INSULATION WITH 1/2 INCH THICK |  							
								| 
									2								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 3 | BRAND: MEQ MULTI SPLIT WALL TYPE | 1.00 | 2,700.00 | 2,700.00 |   Edit |   Delete |  |   | MXY-3G28VA2 WITH MSXY-FN13VE (12000BTU LOCATE AT DINING);MSXY-FN18VE (18000BTU LOCATE AT LIVING) |  | 4 | BRAND: MEQ SINGLE SPLIT WALL TYPE | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  |   | MUY-GN13VA/MSY-GN13VA (12000BTU WALL AT MASTER BEDROOM)
 *3 TICKS |  | 5 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE PRESSURE TEST & WATER PIPE | 1.00 | 550.00 | 550.00 |   Edit |   Delete |  | 6 | REMARKS: |   |   |   |   Edit |   Delete |  |   | 1) WORKS EXCLUDE BRACKET;TRUNKING;16MM DRAIN PIPE AND THOSE NOT STATED IN THIS QUOTATION.
 2) PAYMENT : 70% DEPOSIT, BALANCE UPON COMPLETION OF WORK. |  | Total | 4.00 |   | 6,350.00 |  			 
		 |