				| 1 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL VRF |   |   |   |   Edit |   Delete |  |   | C/W standard copper pipe with insulation(Armaflex Class O),concealed drain pipe ,Cable tray, wiring from blower to condenser,
 testing and Commissioning. |  | 2 | PLOT 22 | 11.00 | 1,050.00 | 11,550.00 |   Edit |   Delete |  |   | 1 set of system 7; 6xWall mounted; 1xCeiling Cassette
 1 set of system 4; 4x wall mounted |  | 3 | PLOT 21 | 11.00 | 1,050.00 | 11,550.00 |   Edit |   Delete |  |   | 1 set of system 7; 6xWall mounted; 1xCeiling Cassette
 1 set of system 4; 4x wall mounted |  							
								| 
									4								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 5 | Terms of payment: |   |   |   |   Edit |   Delete |  |   | 1) 30% deposit to confirm job.
 2) 40% while all piping have run, and before aircon installed.
 3) Full payment when T & C completed.
 * No retention of 5% to HOLD when job completed. |  | Total | 22.00 |   | 23,100.00 |  			 
		 |