No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | To supply and install item 2 & 3 | | | | Edit | Delete | | Including standard copper pipe with insulation, drain pipe, wiring from blower to condenser.
Testing and commissioning. | 2 | Condenser Unit 1 to 2 | 2.00 | 21,800.00 | 43,600.00 | Edit | Delete | | Brand: Mitsubishi Electric VRF R410
PUCY-EP400YSK
CAP(KW)109.9-113.5 | 3 | Fan Coil Unit | 4.00 | | | Edit | Delete | | PEFY-P200VMHS-F | 4 | TO SUPPLY LABOUR AND MATERIAL | 2.00 | 1,900.00 | 3,800.00 | Edit | Delete | | To relocate 2 sets of existing 10HP Ducted Unit include timer controller | 5 | TO SUPPLY LABOUR AND MATERIAL | 2.00 | 1,200.00 | 2,400.00 | Edit | Delete | | To connect 2 units of NEW FCU to existing duct | 6 | TO SUPPLY LABOUR AND MATERIALS TO FABRICATE NEW DUCT | 5.00 | 3,100.00 | 15,500.00 | Edit | Delete | | for 5nos of new FCU
Material used:PE foam
come with :4 x four way grill 250x600
1 x four way grill 250x250 | 7 | To supply and install Water Tray | 5.00 | 350.00 | 1,750.00 | Edit | Delete | 8 | To supply and install Filter | 5.00 | 180.00 | 900.00 | Edit | Delete | 9 | Sky Lifting $800/Day | 1.00 | 800.00 | 800.00 | Edit | Delete |
10 |
|
|
|
|
|
|
|
11 | Relocate CRC controller from Level 6 to Level 4 with T & C | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | 12 | ADD ON system 1 to 6 with install: | 1.00 | 37,000.00 | 37,000.00 | Edit | Delete | | Condenser Unit: EP500YSKA/PEFY
Indoor Unit: P200VMHSE x1 ;
Cassette Type PLFYP100VBME x 2;
Cassette Type PLFY P32VBME x 3 | 13 | ADD ON Modification on Existing Condenser Unit Ducting elbow | 3.00 | 450.00 | 1,350.00 | Edit | Delete | 14 | ADD ON : Shift up existing Condenser Unit | 2.00 | 300.00 | 600.00 | Edit | Delete | Total | 33.00 | | 109,500.00 |
|