No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | | 1.00 | 450.00 | 450.00 | Edit | Delete | | To supply labour and materials to lay protection along walkway and furniture prior commencement
of work. | 2 | | | | | Edit | Delete | | To supply labour and material to dismantle and dispose existing fancoil, ducting and condenser unit
|
3 |
|
|
|
|
|
|
|
4 | | | | | Edit | Delete | | To supply labour and material to fabricate and install one (01)lot of aircon duct complete
with internal insulate with rock wool,external insulate with blanket,
double sided aluminium foil,hanging brackets, drain pan and filter. | 5 | | 3.00 | 2,900.00 | 8,700.00 | Edit | Delete | | Bar Grill for FXMQ100P(38,200BTU) @ Family Hall/FXMQ100P(38,200BTU) @ Bedroom 2(Son's Room)
And FXMQ125P(47,800BTU) @ Master Bedroom | 6 | | 2.00 | 2,400.00 | 4,800.00 | Edit | Delete | | Bar Grill for FXMQ80P(30,700BTU) @ Bedroom 1(Guest Rm) and FXMQ50P(19,100BTU) @ Walk in Wardrobe | 7 | | 1.00 | 2,300.00 | 2,300.00 | Edit | Delete | | To supply labour and handtools to make good ceiling opening come with new access panel
near each fancoil for future maintenance complete with one coat oil base sealant and two
coat white paint finishing on affected area only. | 8 | | 1.00 | 500.00 | 500.00 | Edit | Delete | | To supply labour and transport to provide crane service to hoist down existing CU and
hoist new CU to roof top come with licensed lifting crew. | Total | 8.00 | | 16,750.00 |
|